Connect Various Buildings to Shore Power

OWNER:
Navy Public Works Department

TYPE OF CONSTRUCTION:
Electrical

LOCATION:
Camp Lemonnier Djibouti, Africa

TOTAL AMOUNT:
$773,644.00

Design/Build: This project is to connect eight buildings to shore power. Extend Prime Power 2 (PP2) feeder circuit to government furnished, contractor installed 500 and 1000 kVA transformers. Excavate, Trench and install 1,050 linear foot of new Electrical cables installed within a concrete encased duct bank. The work also included providing a new four-way load break switch, 600 volt single conductors in conduits from the 500 kVA transformer to the existing main distribution panelboards.