Mental Health Phase 1

OWNER:
Department of Veteran Affairs

TYPE OF CONSTRUCTION:
New Construction

LOCATION:
Salisbury, NC

TOTAL AMOUNT:
$7,644,439.00

This project consisted of new vertical construction of a 25,000 sq ft Mental Health facility. The scope of work included:

  • Extensive Site work (Demo, Grade and Infill 8,400 CY, Erosion Control)
  • Underground Utilities (Demo and Replace Storm, Sanitary and Water lines)
  • Auger Cast Piles (257) 16” diameter, 30’ deep
  • Concrete, Forms and Rebar
  • Masonry: 75,000 square foot new brick installation, 1,900 Precast panels
  • Structural Steel (235 tons)
  • Roofing: 23,600 sf. of EPDM
  • Installed (108) Fixed and Side Hinged Exterior Dept. of Defense
  • Blast Resistant windows.
  • Stucco and EIFS: 3,500 square foot
  • Finishes: Drywall and Metal Framing, Acoustical Ceiling, Flooring (Carpet, Ceramic, and Vinyl Sheet)
  • Elevators (2 Passenger, 2 Service- 4 landings)
  • HVAC and Plumbing (Extensive SOW)
  • Electrical: (Extensive SOW: Generator, Transformers, Fire Alarm, Voice and Data, Security, CCTV)